Technical Services
Technical Services: From Material Selection to OEM Approval and SOP
We don't just sell adhesive. We help you take a wrapped part through validation to series production: joint development, pre-validation testing to your OEM's standard, on-site process tuning and failure analysis. All of it is free for RELANET customers and for plants evaluating RELANET. These are our automotive adhesive technical services, from material selection to OEM approval and SOP.

At a glance
Free
All technical services, samples up to 20 kg
8 steps
From material data to SOP
24 h / 48 h
On site in South China / East, North and Central China
7 days
Custom samples for difficult substrates, in working days
10+
Vehicle programs we've taken to production
Joint Development in Eight Steps
Align the Route Before Choosing the Adhesive
Automotive adhesive joint development with RELANET runs in eight steps, from material data to SOP.
- 01
Step 1: Material data
- You provide
- Substrate system, skin specification, process route
- RELANET delivers
- Review of the inputs and any open questions
- 02
Step 2: Trial materials
- You provide
- 1–2 m² of skin and substrate
- RELANET delivers
- Flat-panel tests: material and environmental durability, without process variables
- 03
Step 3: Test report
- You provide
- —
- RELANET delivers
- Feasibility and how close you are to the target, while nothing has been invested; any material change we recommend
- 04
Step 4: Trial on real parts
- You provide
- Parts, line time, equipment
- RELANET delivers
- Engineers on your line; material data checked on the real process
- 05
Step 5: Process record
- You provide
- —
- RELANET delivers
- Dimensions, coat weight, temperatures, cycle time; improvement suggestions for the Tier 1
- 06
Step 6: Part-level data
- You provide
- —
- RELANET delivers
- A complete data set the Tier 1 can submit to the OEM
- 07
Step 7: Curing protocol / work instruction
- You provide
- Review and sign-off
- RELANET delivers
- If OK: a written curing and process protocol (for manual or fully automated lines), shared with the OEM. If not OK: revised trial until it passes
- 08
Step 8: SOP and follow-up
- You provide
- Production launch
- RELANET delivers
- Supply, batch tracking and technical follow-up after launch
The service customers value most: the curing protocol in step 7. It turns a working trial into a standard process that your operators, your quality team and the OEM all work from.
OEM Approval Support
Pre-Validation to Your OEM's Own Standard
Each OEM tests to its own standard, and data from one OEM doesn't carry over to another. We run pre-validation testing before you submit:
This is our automotive adhesive material approval support, from standard specimens to series production.
| OEM standard | What we test |
|---|---|
| Nissan NES M0160 (and VES test methods) | Peel, aging, odor and emissions |
| Honda 0095Z-SDA | Peel, aging, emissions |
| BYD interior standards | Peel, heat aging, cyclic damp heat |
| GAC R&D Center standards | Heat, humidity and long-term aging |
Nissan NES M0160 (and VES test methods)
- What we test
- Peel, aging, odor and emissions
Honda 0095Z-SDA
- What we test
- Peel, aging, emissions
BYD interior standards
- What we test
- Peel, heat aging, cyclic damp heat
GAC R&D Center standards
- What we test
- Heat, humidity and long-term aging

The approval route we support
| Stage | What happens | RELANET's role |
|---|---|---|
| 1. Standard specimens | Flat-panel tests on your materials | Test and report |
| 2. Part tests | Tests on real parts from trial runs | Trial support, data |
| 3. Third-party reports | VOC, odor and aging reports from accredited labs (e.g. SGS) | Arrange and supply reports |
| 4. OEM approval | Submission by the Tier 1 | Part-level data package |
| 5. PPAP | Production part approval documents | PPAP file support |
| 6. Series production | SOP | Supply and follow-up |
1. Standard specimens
- What happens
- Flat-panel tests on your materials
- RELANET's role
- Test and report
2. Part tests
- What happens
- Tests on real parts from trial runs
- RELANET's role
- Trial support, data
3. Third-party reports
- What happens
- VOC, odor and aging reports from accredited labs (e.g. SGS)
- RELANET's role
- Arrange and supply reports
4. OEM approval
- What happens
- Submission by the Tier 1
- RELANET's role
- Part-level data package
5. PPAP
- What happens
- Production part approval documents
- RELANET's role
- PPAP file support
6. Series production
- What happens
- SOP
- RELANET's role
- Supply and follow-up
Typical figures: one OEM re-test round after an adhesive change takes at least 6 months and RMB 20,000–30,000 (≈ USD 2,800–4,200); full material approval usually 6–18 months. Our materials on published programs are registered in China's national automotive materials database.
On-Site Technical Support
When the Line Has a Problem, We Come to the Line
How we respond: phone and video diagnosis first; if that doesn't solve it, an engineer on site.
| Region | On site |
|---|---|
| South China | Within 24 h |
| East, North and Central China | Within 48 h |
| Outside China | Remote video diagnosis and parameter guidance; documents and adhesive shipped direct to your plant |
South China
- On site
- Within 24 h
East, North and Central China
- On site
- Within 48 h
Outside China
- On site
- Remote video diagnosis and parameter guidance; documents and adhesive shipped direct to your plant
- South China — Within 24 h
- East, North and Central China — Within 48 h
- Outside China — Video call
What we tune on site
| Area | Settings |
|---|---|
| Spraying | Coat weight, gun settings, overspray |
| Drying and activation | Oven zones and temperatures, IR power and time |
| Pretreatment | Flame / plasma settings, the 4-hour window |
| Pressing | Mold gap (0.1–0.2 mm for the adhesive layer), pressure, hold time, demold temperature |
| Curing | Cure time before handling and assembly |
| Climate | Solids, activation temperature and open time adjusted for humid or cold seasons |
Spraying
- Settings
- Coat weight, gun settings, overspray
Drying and activation
- Settings
- Oven zones and temperatures, IR power and time
Pretreatment
- Settings
- Flame / plasma settings, the 4-hour window
Pressing
- Settings
- Mold gap (0.1–0.2 mm for the adhesive layer), pressure, hold time, demold temperature
Curing
- Settings
- Cure time before handling and assembly
Climate
- Settings
- Solids, activation temperature and open time adjusted for humid or cold seasons
On one Honda program, our support went as far as specifying the infrared lamp power with the equipment supplier.
Failure Analysis
Four Lines, One Variable at a Time
Automotive adhesive failure analysis at RELANET checks four lines and changes one variable at a time.
| Line | What we check |
|---|---|
| Materials | Substrate (grade, regrind, release agent), skin backing and lot, adhesive lot |
| Equipment | Mold gap and cooling, oven, IR, spray guns, hot-melt hoses |
| Environment | Temperature, humidity, substrate temperature, contamination |
| Process | Pretreatment window, coat weight, mix ratio, activation, pressing, cure time |
Materials
- What we check
- Substrate (grade, regrind, release agent), skin backing and lot, adhesive lot
Equipment
- What we check
- Mold gap and cooling, oven, IR, spray guns, hot-melt hoses
Environment
- What we check
- Temperature, humidity, substrate temperature, contamination
Process
- What we check
- Pretreatment window, coat weight, mix ratio, activation, pressing, cure time
Materials
Substrate (grade, regrind, release agent), skin backing and lot, adhesive lot
Equipment
Mold gap and cooling, oven, IR, spray guns, hot-melt hoses
Environment
Temperature, humidity, substrate temperature, contamination
Process
Pretreatment window, coat weight, mix ratio, activation, pressing, cure time
Bonding failure
Please send us: the batch number, the failed part, line records, ambient temperature records, and photos or video of the defect.
What we've learned: about 90% of debonding starts at the interface, and in our project experience fewer than 5% of on-site failures trace back to the adhesive itself. We keep about 250 ml from every batch, so any shipment can be compared with its retained sample.

Support for the Life of the Program
| Service | What you get |
|---|---|
| Customer file | A digital record of your materials, process parameters and test history |
| Regular follow-up visits | Line data collected and reviewed with your team |
| Performance-decline early warning | Alerts when production data shows the bond drifting, before parts fail |
| Process fine-tuning | Parameter adjustments as materials, seasons or volumes change |
| New-formula notices | We tell you when a new formula or process could help your line |
| Annual health report | Annual adhesive-system report: failure statistics and cost-saving potential |
| Batch consistency | Batch viscosity variation ≤3%; incoming, in-process and final inspection; retained samples |
Customer file
- What you get
- A digital record of your materials, process parameters and test history
Regular follow-up visits
- What you get
- Line data collected and reviewed with your team
Performance-decline early warning
- What you get
- Alerts when production data shows the bond drifting, before parts fail
Process fine-tuning
- What you get
- Parameter adjustments as materials, seasons or volumes change
New-formula notices
- What you get
- We tell you when a new formula or process could help your line
Annual health report
- What you get
- Annual adhesive-system report: failure statistics and cost-saving potential
Batch consistency
- What you get
- Batch viscosity variation ≤3%; incoming, in-process and final inspection; retained samples
What's Free
| Service | Cost |
|---|---|
| Samples up to 20 kg | Free |
| Side-by-side tests, including against your current grade | Free |
| Pre-validation testing to your OEM's standard, with report | Free |
| On-site process tuning | Free |
| Failure analysis | Free |
| Custom-formula samples (7 working days) | Free |
| Orders above 20 kg | Purchased |
Samples up to 20 kg
- Cost
- Free
Side-by-side tests, including against your current grade
- Cost
- Free
Pre-validation testing to your OEM's standard, with report
- Cost
- Free
On-site process tuning
- Cost
- Free
Failure analysis
- Cost
- Free
Custom-formula samples (7 working days)
- Cost
- Free
Orders above 20 kg
- Cost
- Purchased
Typical Timelines
| Project | Typical time |
|---|---|
| Custom samples for difficult substrates | 7 working days |
| Custom formula, laboratory development | 1–2 months |
| Replacing your current adhesive (same part) | About 3 months |
| New vehicle program | 12–36 months, following the OEM's milestones |
| Example: Nissan NX7, solvent to waterborne | About 2 years of joint development |
| Example: Honda illuminated trim | June 2022 start → May 2024 approval → October 2024 series production |
Custom samples for difficult substrates
- Typical time
- 7 working days
Custom formula, laboratory development
- Typical time
- 1–2 months
Replacing your current adhesive (same part)
- Typical time
- About 3 months
New vehicle program
- Typical time
- 12–36 months, following the OEM's milestones
Example: Nissan NX7, solvent to waterborne
- Typical time
- About 2 years of joint development
Example: Honda illuminated trim
- Typical time
- June 2022 start → May 2024 approval → October 2024 series production
Typical figures; your OEM's schedule decides.
Documents We Deliver
| Document | Notes |
|---|---|
| TDS and SDS / MSDS | Chinese and English |
| COA | Every batch |
| Third-party test reports | VOC, odor, fogging, aging (e.g. SGS) |
| PPAP file pack | For OEM submission |
| Curing and process protocol | Written for your line, shared with the OEM |
| REACH / ELV declarations | On request |
| Sea-transport safety appraisal certificate | Waterborne grades |
TDS and SDS / MSDS
- Notes
- Chinese and English
COA
- Notes
- Every batch
Third-party test reports
- Notes
- VOC, odor, fogging, aging (e.g. SGS)
PPAP file pack
- Notes
- For OEM submission
Curing and process protocol
- Notes
- Written for your line, shared with the OEM
REACH / ELV declarations
- Notes
- On request
Sea-transport safety appraisal certificate
- Notes
- Waterborne grades
What We Do for Your Role
| Your role | What we do for you |
|---|---|
| Tier 1 process engineer | Tune your line on site; write the curing protocol; find the root cause when parts fail |
| OEM materials engineer / SQE | Pre-test to your standard; supply third-party reports; batch traceability with retained samples; registration in the national materials database |
| Purchasing | Free samples up to 20 kg; free side-by-side test against your current grade; standard stock of R-5670, R-7206 and RY-10 |
| Plant manager / owner | Lower part cost: HaiTian Group cut adhesive cost by 50% after replacing an imported adhesive; the full cost of solvent-to-waterborne conversion |
Tier 1 process engineer
- What we do for you
- Tune your line on site; write the curing protocol; find the root cause when parts fail
OEM materials engineer / SQE
- What we do for you
- Pre-test to your standard; supply third-party reports; batch traceability with retained samples; registration in the national materials database
Purchasing
- What we do for you
- Free samples up to 20 kg; free side-by-side test against your current grade; standard stock of R-5670, R-7206 and RY-10
Plant manager / owner
- What we do for you
- Lower part cost: HaiTian Group cut adhesive cost by 50% after replacing an imported adhesive; the full cost of solvent-to-waterborne conversion
Frequently Asked Questions
Short answers on cost, response times, automotive adhesive material approval support and failure analysis.
Do you charge for technical services?
No. Samples up to 20 kg, side-by-side tests, pre-validation testing, on-site tuning and failure analysis are free.
How fast can an engineer be on site?
Within 24 h in South China and 48 h in East, North and Central China. We start with phone and video diagnosis, and an engineer replies within 1 working day.
Can you support plants outside China?
Yes, by remote video diagnosis and parameter guidance, with documents and adhesive shipped direct to your plant.
What do you need to start?
Substrate, skin, process route, cycle time and the OEM standard, plus 1–2 m² of skin and substrate for flat-panel tests.
What do you need for failure analysis?
Batch number, the failed part, line records, ambient temperature records, and photos or video.
Do you help with OEM approval?
Yes. We pre-test to Nissan NES M0160, Honda 0095Z-SDA, BYD and GAC standards and prepare part-level data and PPAP files for your submission.
Book a Technical Call
Tell us the part, materials, process and OEM. An engineer replies within 1 working day.